May 2015 Drill Program and results

The plan below illustrates the location of the historic drill holes and the sites of the 2015 drill program on the Shumagin vein system.

  • Plan Map of the Shumagin Prospect showing locations of 2015 infill and step-out holes
    Plan Map of the Shumagin Prospect showing locations of 2015 infill and step-out holes

Appendix B

2015 Drill hole Collar/Survey Data

Drill Hole ID UTM Northing UTM Easting Elevation Est. meters Azimuth @ Collar Dip @ Collar Total Depth (meters) Target Elevation Drill Hole Type
15SH011 6120718 399481 78 330 -45 106.7 20m ASL Infill
15SH012 6120718 399481 78 330 -60 134.1 -20m BSL Infill
15SH013 6120699 399600 53 330 -45 170.7 -60m BSL Infill
15SH014 6120699 399600 53 330 -60 213.4 -120m BSL Infill
15SH015 6120735 399700 45 330 -45 210.3 -85m BSL Step-out
15SH016 6120735 399700 45 330 -55 232.6 -135m BSL Step-out
15SH017 6120767 399748 43 330 -45 201.2 -90m BSL Step-out
15SH018 6120767 399748 43 330 -53 228.6 -130m BSL Step-out

TSX-V: RGC

Last: $0.025 (-16.67%)

OTC: RGCTF

Last: $0.022 (0.00%)
© 2019 Redstar Gold Corp.
All rights reserved.
Disclaimer

Subscribe to our Email List